Admor Civil Engineering Limited
Highley
Admor Civil Engineering LImited assisted Systems Geotechnique in stabilising the site to enable the construction of a new engine shed and visitors centre for Severn Valley Railway. Systems Geotechnique undertook all of the grouting, soil nailing and piling works with Admor Civil Engineering doing the earthworks and providing the attendant plant on the pilers.
|
------------------------------------------------------------------------------------------------------------------------
 |
Magna Mains
Admor Civil Engineering Limited working alongside Tyco Fire to install new sprinkler mains at Magna Park, Lutterworth. The works consisted of installing 450m of 315mm diameter mains through the adoptable roads, and verges of Magna Park - a large and very active distribution hub. Admor had to deal with a large number of significant existing services to install the main.
Working as a Package Contractor, Admor worked closely with Tyco to complete the works to the client’s satisfaction, within the timescales of the contract. With full responsibility for Labour, Plant and Materials Admor were able to work with a minimum amount of external supervision.
|
------------------------------------------------------------------------------------------------------------------------
 |
Lymedale
Admor Civil Engineering Limited working alongside Tyco Fire to install new sprinkler mains at Asda’s distribution unit in Newcastle under Lyme. The works consisted of installing 400m of 100mm diameter mains through the site - a large and very active distribution warehouse. Working with Asda to minimise the disruption to the operations including trenching through the goods in yard.
Working as a Package Contractor, Admor worked closely with Tyco to complete the works to the client’s satisfaction, within the timescales of the contract. With full responsibility for Labour, Plant and Materials Admor were able to work with a minimum amount of external supervision.
|
------------------------------------------------------------------------------------------------------------------------
 |
Sleaford
Admor Civil Engineering Limited has completed a £1/4 million contract for the substructure and external works to the industrial unit in Sleaford. Working with WF Wagner to overcome some difficult ground conditions, the building was piled by Systems Geotechnique Ltd as a domestic subcontractor to Admor.
It was the second time Admor has worked with WF Wagner and we look forward to the next project
|
|
|